Jev and Opus 5.5 rebuild a landing page 27 times in 36 seconds
A 2015-style project management site is rebuilt live 27 times, with each section getting a new layout and palette as it enters the viewport, Jev issuing the calls and Opus 5.5 writing the code.
Jev + Opus 5.5 should not be allowed near a landing page. A 2015 project-management site just got rebuilt 27 times in 36 seconds - every section, the moment it hits the viewport. How it runs: 1. a section enters view 2. Jev returns one typed call in ~90ms { layout, type, palette, drop, p } 3. Opus 5.5 writes the section 4. new look scans in on a diagonal clip, old look tears out with a 2-frame RGB split 5. next section. one at a time. no pile-ups pass 1: grain poster ↓ pass 2: halftone press ↑ pass 3: schematic grid ↓ 1 hero = 6 looks Jev picks the call. Opus draws it.
This post quotes another post: x.com/merccante/status/2102478458727113139